Customization: | Available |
---|---|
Warranty: | a Year |
Application: | Household Appliances, Electronic, Hardware, Car, Commodity |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name | Stamping die, metal die, progressive die, compound die |
Product material | SKD11, DC53, Cr12MOV, CR12, SKD61, etc |
Design software | AutoCAD, PRO/E, UG, catia, Dynaform, solidworks, etc. |
Cavity | Single cavity/multiple cavity |
Drawing format | igs,stp,prt,asm,pdf,dwg,dxf |
Die life | No less than 500,000 times |
Packing | Wooden box |
Application | Aviation, automobile, household appliances, medical, hardware, construction, etc |
Standard parts | MISUMI |
Mold making service | Provide OEM/ODM services |
Hengshui Dongmo Precision Metal Products Co., Ltd. is a one-stop service company integrating research and development, design, manufacturing, processing and technical training.
We have rich successful experience in making various molds according to customer requirements.
We have been focusing on the research and development of metal products production. Our company specializes in producing all kinds of metal products: stamping, welding, drawing, polishing, die, OEM and one-stop production.
Mold processing equipment: CNC machining center, CNC wire cutting machine tool, CNC electric spark forming machine tool, turning, milling, grinding and other high-precision processing equipment.
Stamping equipment: 630T, 500T, 315T, 200T, 160T, 100T stretch forming hydraulic press and various large, medium and small tonnage punches.
Cutting equipment: 2D CNC laser cutting machine, 3D CNC laser cutting machine.
quality assurance
1. Are you a manufacturer or trading company?
A: We are a manufacturer with many years of design experience and manufacturing capabilities in the field of metal stamping and its accessories.
2. What are your main products?
A: We focus on the production of hardware stamping molds and their accessories. Our products are suitable for household appliances, auto parts, hardware parts, etc.
3. What is the delivery time?
The delivery time of the mold is 3-10 weeks after receiving the deposit. If the mold quantity is large or the difficulty is high, it may be extended.
4. Do you test all goods before delivery?
Yes, we have 100% testing before delivery.