Customization: | Available |
---|---|
Warranty: | a Year |
Application: | Hardware |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The purpose of the liquefied gas cylinder base is to keep the cylinder stable and upright. The hole on the base is convenient to remove water and prevent corrosion and rust of the base and the lower head. The base should have a certain height so that the flat bottom can keep a certain distance from the ground.
Product detailsProduct name | Cylinder mould |
Application | Pressure vessel |
Material | Q195/Q235 |
Standard Parts | MISUMI |
Template flatness | +/-0.005mm |
Quantity | 1 set |
Package | According to customer requirements |
Die life | No less than a million times |
Since the establishment of the company, adhere to the provision of high standards, high quality stamping die and supporting.
1) We adhere to the overall solution service:
Product design optimization → stamping die design → stamping die manufacturing → stamping die debugging → product
inspection → mold specification manual sharing → after-sales support.
2) Mold making machine
Equipped with grinding machine, milling machine, drilling machine, NC processing, line cutting machine and other complete
equipment. Almost all of the processing is done in-house. We can guarantee the quality and delivery time.
3) Delivery
We have experienced mold design team, from product analysis, mold design, mold processing, mold assembly, mold debugging,
mold acceptance and other whole process tracking,
Ensure the delivery time of stamping die.
4) Ensure the delivery time of the stamping die
1) Delivery time of 2 to 6 weeks.
2) Exports to more than 30 counties.
3) Update the stamping die construction progress to the customer every week, control the project progress and ensure the project progress.
4) Rich import and export experience, cooperate with powerful logistics companies and major express companies to ensure
smooth export and delivery to customers as soon as possible.
With rich export experience, we choose reasonable packing for you to reduce the risk of transportation.
1) Besides molds, do you make any products?